DELAYS AT PATRICK TERMINAL TONIGHT 8.7.13
Dear valued Client,
We wish to advise that Patricks Terminal have had a shut down tonight to recover a damaged container which has incurred lengthy delays.
At this time there is approximately a 1.5 to 2 hour turnaround.
Regards,
LOCH M. FRASER LOGISTICS Pty Ltd
Danny Cobb Director/Seafreight Ops
a 1 Tradepark Drive, Tullamarine, Victoria 3043
p +61 3 9009 5207 f +61 3 9335 5917
e danny.cobb@lochm.com.au w www.lochm.com.au
Get social with us and see the latest news items from: